Google

Technical Program Manager, Data Center Construction and Design

place Reston, VA, USA ; Austin, TX, USA ; +7 more

Found: February 1, 2026

⚠️ This job posting is no longer active and may not be accepting applications. Browse similar live jobs below, or see all current Google jobs.

This role is based in Reston, VA or Austin, TX, with remote eligibility.

Compensation:

$227,000-$320,000/year + bonus + equity + benefits

Responsibilities:

  • Lead design, construction, and capital project support for large-scale data center projects.
  • Develop and mentor teams of engineers and project managers.
  • Manage stakeholder relationships and resolve misalignment.
  • Foster a culture of continuous improvement.

Minimum qualifications:

  • Bachelor's degree in Engineering or related field.
  • 10 years of experience in program management.
  • Experience in mission-critical facilities and construction lifecycle.

Preferred qualifications:

  • Master's Degree or PhD in relevant fields.
  • Experience with data center equipment and environments.
  • Ability to manage cross-functional projects.

Get jobs like this in your inbox daily

Fresh FAANG jobs, every day, filtered for your role and location.

Apple Google Amazon Meta OpenAI Microsoft Nvidia Stripe TikTok Netflix Uber Airbnb Booking Spotify Canva Pinterest
or use email

Similar Big Tech Jobs - Posted in the Past 24h

🏠 Airbnb

Lead Program Manager, Design

United States
🏠 Airbnb

Senior Program Manager, Design

United States
πŸ” Google

Program Manager II, Demand Planning, Google Data Center

place Atlanta, GA, USA ; Sunnyvale, CA, USA

Same role, other locations

πŸ” Google

Technical Program Manager, Gemma, DeepMind

place London, UK ; ZΓΌrich, Switzerland
πŸ” Google

ESC Delivery Program Manager

place London, UK ; Dublin, Ireland
Stanislav Prigodich

Hey, I'm Stan

Software Developer & Creator of Top Jobs Today

I'm a software developer, and over time I realized I cared mostly about roles at big tech companies - not just whatever happened to show up on LinkedIn or generic job boards. But those sources weren't enough - some roles were delayed, or never posted at all.

So I built this website to solve that. It scrapes fresh job postings directly from official company sites, figures out what kind of roles they really are, and sends them as email alerts - simple, fast, and focused.

Hope it makes your search easier too. Wishing you the best of luck - and I'm really glad you're here!